Availability: | |
---|---|
Quantity: | |
EASY SCAFFOLDING & FORMWORK
Size: 1800-3200MM
Min (MM) | Max (MM) | Inner Tube (MM) | Outer Tube (MM) | Material | Surface Treatment |
2000 | 3600 | 48*2.0 | 60*2.0 | Q195/Q235 | Painted; EleGal; powder coated HDG; |
2200 | 3900 | 48*2.0 | 60*2.0 | Q195/Q235 | |
2500 | 4500 | 48*2.0 | 60*2.0 | Q195/Q235 | |
3000 | 5500 | 48*2.0 | 60*2.0 | Q195/Q235 |
Formwork supports: In formwork project, it can provide support for walls, panels, columns and beams.
Scaffolding support: In scaffolding project, it can provide additional support and stability.
Renovation works: Suitable for all kinds of equiring temporary structural support.
Versatility: it is flexible to use,and can be suitable for various construction popurse.
Efficiency: It is easy to install and adjust, rotate the adjusting nut to adjust the height, then reducing labor time and cost.
Safety: It is improve the safety of the construction site by providing reliable support.
To ensure proper grounding: The pillar base should be placed on a stable, level ground or construction platform.
To correct adjustment: After adjusting the pillar to the required height, then put locking pin inserte the right to fix it.
Regular checking: Check for Any signs of wear and damage before and during use.
Size: 1800-3200MM
Min (MM) | Max (MM) | Inner Tube (MM) | Outer Tube (MM) | Material | Surface Treatment |
2000 | 3600 | 48*2.0 | 60*2.0 | Q195/Q235 | Painted; EleGal; powder coated HDG; |
2200 | 3900 | 48*2.0 | 60*2.0 | Q195/Q235 | |
2500 | 4500 | 48*2.0 | 60*2.0 | Q195/Q235 | |
3000 | 5500 | 48*2.0 | 60*2.0 | Q195/Q235 |
Formwork supports: In formwork project, it can provide support for walls, panels, columns and beams.
Scaffolding support: In scaffolding project, it can provide additional support and stability.
Renovation works: Suitable for all kinds of equiring temporary structural support.
Versatility: it is flexible to use,and can be suitable for various construction popurse.
Efficiency: It is easy to install and adjust, rotate the adjusting nut to adjust the height, then reducing labor time and cost.
Safety: It is improve the safety of the construction site by providing reliable support.
To ensure proper grounding: The pillar base should be placed on a stable, level ground or construction platform.
To correct adjustment: After adjusting the pillar to the required height, then put locking pin inserte the right to fix it.
Regular checking: Check for Any signs of wear and damage before and during use.